Example
A permanent station with a Trimble receiver, cellular phone, modem, and
computer located in Boulder, Colorado, approximately at latitude
40´02´´ N, 105´14´´ W, elevation 1602
meters.
Power consumption:
Equipment Power Hours/day
Trimble 4000SSi receiver 9W 24
Cellular phone 15W 4
Cellular phone modem 10W 4
Computer 20W 4
Daily amp-hour load:
Equipment Calculation Ah
Trimble 4000SSi receiver 9W/12V × 24h 18.0
Cellular phone 15W/12V × 4h 5.0
Cellular phone modem 10W/12V × 4h 3.33
Computer 20W/12V × 4h 6.67
Total 33.0
Efficiency and loss-corrected load:
33 Ah / 0.8 = 42 Ah.
Worst case equivalent sun hours (ESH) for Boulder, CO:
3.5 hours
Solar array current requirement:
42 Ah / 3.5 h = 12A
Number of solar panels in parallel:
Three solar modules are currently being used in UNAVCO designs:
- Siemens PC-4JF rated at 75W (4.4 A
17.0 V)
- Siemens M75 rated at 48W (3.02 A
15.9 V)
- Solarex MSX-30 rated at 30W (1.68 A
17.8 V)
Choosing the M75 module, four panels are needed to cover the solar array current requirements:
12A / 3.02A per panel = 3.97 panels
Autonomy or reserve time:
Choosing five days of autonomy with 50% maximum discharge:
5 × 42 Ah / 50% = 420Ah battery bank
Battery bank (backup) size:
Three types of sealed deep cycle batteries are currently being used in UNAVCO designs:
- Deka 90Ah
- Deka 66Ah
- Deka 30Ah
As an example, if you choose the Deka 90Ah, five batteries are needed to provide the required autonomy. 420Ah / 90Ah per battery = 4.67 batteries.
Last modified Thursday, 25-Jan-2007 23:56:50 UTC
 |
 |
|